The City of Regina is planning to transform Rawlinson Crescent Park. The space will be expanded to include a regulation-sized cricket field, seasonal washrooms, walking paths and a parking lot. There will also be trees and landscaping, including drainage improvements.
The plan is to service the site in 2025 and have detailed design work occur in 2026. Construction will occur in 2027 as weather, construction schedules and budget allow.
The City of Regina is planning to transform Rawlinson Crescent Park. The space will be expanded to include a regulation-sized cricket field, seasonal washrooms, walking paths and a parking lot. There will also be trees and landscaping, including drainage improvements.
The plan is to service the site in 2025 and have detailed design work occur in 2026. Construction will occur in 2027 as weather, construction schedules and budget allow.
-
Concept Plan Update
After engagements with residents whose properties back onto the park, the Albert Park Community Association and Regina Cricket Association, City staff have revised the concept plan to include the following changes:
- The cricket field has been shifted 10 metres north and rotated 45 degrees from north-south orientation to northwest-southeast orientation.
- The multi-use path alignment has been adjusted and moved north approximately 7 metres.
- A planting strip and swale have been added to the west side of the park at the church parking lot.
- The berm between the field and the residences has been increased to a maximum height of 3 metres.
- Hill seating, team shelters and the washroom location have been adjusted to accommodate the new alignment of the cricket field.
- An additional 100 trees have been included, which brings the proposed number of trees to over 300.
View the Revised Concept Plan here or from the Documents widget.
-
A Cricket Field and Amenities for All
Cricket is a growing sport in Regina. A lack of cricket fields was identified as a need when the City’s Recreation Master Plan was developed, and Rawlinson Crescent Park is an opportunity to fill this gap. The project will include a regulation-sized field that supports tournament and league play.
The project will also make the space more vibrant and attractive. Planned amenities such as accessible washrooms, walking paths, trees, seating, and a parking lot will benefit everyone who uses the park.
Stay tuned for more information!
Signup Banner
Who's Listening
-
Email parksplan@regina.ca
Lifecycle
-
2024
Rawlinson Crescent Park has finished this stageA site was selected for the project.
-
Spring 2025
Rawlinson Crescent Park has finished this stagePreliminary design occurred. This is the ideas stage where ideas and concepts for the project were explored.
-
Summer 2025
Rawlinson Crescent Park is currently at this stageEngagements occur with local residents whose properties back onto the park and with stakeholder groups.
-
Summer/Fall 2025
this is an upcoming stage for Rawlinson Crescent ParkThe City seeks public feedback about the plan.
Final design developed.
Rezoning and servicing the site occurs.
-
2026
this is an upcoming stage for Rawlinson Crescent ParkConstruction drawings are created.
-
Spring – Fall 2027
this is an upcoming stage for Rawlinson Crescent ParkConstruction occurs.
-
Summer 2028
this is an upcoming stage for Rawlinson Crescent ParkPartial opening of the park.
-
Summer 2029
this is an upcoming stage for Rawlinson Crescent ParkScheduled cricket play begins.